Stein Ray successfully defended an EPC firm against delay and cost overrun claims in excess of $200 million in connection with a gas processing facility in Western Canada.

Stein Ray defended a major EPC firm on a $100 million claim in connection with a chemical processing facility in Arkansas.

Stein Ray recovered for an EPC contractor the entirety of a claimed amount of $8 million in an arbitration involving a fertilizer plant.

As counsel for the US subsidiary of a Canadian pipeline company, Stein Ray prosecuted claims in arbitration for engineering defects occurring along a 2,000 mile oil pipeline. The claims included delay, soil subsidence, and pipe support design.

Stein Ray defended an owner of a $50 million resort from contractor claims and prosecuted the owner's defective work claims in a bench trial spanning 20 weeks.

Stein Ray defended an owner against a Type II subsurface soil condition claim and prosecuted a claim for diesel engine design defects at a Guatemalan power plant resulting in an award worth $80 million to Stein Ray's client.

Stein Ray successfully defended a major water treatment company from a claim of $6 million which arose from the construction of an Arizona power plant and recovered the full contract balance of $2 million.

Stein Ray recovered $6.2 million (Canadian Dollar) against Underwriter's for coverage for liquidated damages assessed against a top 5 EPC firm in connection with the late mechanical completion of one of Canada's largest alcohol distilleries.

Stein Ray obtained an arbitration award on behalf of an EPC contractor against an erection subcontractor for a waste water treatment system.

Stein Ray prosecuted and defended delay claims in an arbitration which included 90 days of evidence.

Stein Ray defended an environmental engineering firm from a $15 million claim for breach of contract in connection with Army Corp of Engineers directed remediation work.

Stein Ray obtained a "not guilty" verdict in a $20 million claim arising from wrongful death and personal injuries incurred in the collapse of structural steel for the New Chicago Post Office.

Stein Ray won a $1.4 million jury verdict against Northwest Airlines for a computer integration firm in a breach of contract action over preliminary design services. The jury returned its verdict after a three-week trial. In addition, the jury found in favor of Stein Ray's client on the defendant's counterclaim for fraud and breach of fiduciary duty.

Stein Ray won a $1.8 million dollar jury verdict for a mechanical subcontractor for delays, work acceleration and lost profits arising from the construction of a civic arena.